A bridge and tarmac could make this a ten. Why should bikes always give way to cars where their routes cross?
Length | 1 km | Rating | Passable |
Authority | WMDC | Surface | 1 |
OS Sheet | 104 | Width | 2 |
Between | Carr Gate 1 | Traffic | 0 |
OS Ref. | 4314, 4244 | Stops | 0 |
and | Outwood Station | Danger | 0 |
OS Ref. | 4323, 4245 | Navigability | 1 |
Date | 31/07/2001 | Route | 1 |
Author | Steve Kidd | Score | 5 |
---|---|---|---|
By Rail | Outwood | ||
How to find | Use map, or opposite Outwood station | ||
Connection | Carr Gate 1 |